SAMAX works 24/7 on reliable crane rail projects. We are happy to show you what we have been doing in recent years.

Can SAMAX Rail do something for you?

Do not hesitate and contact us.

Urenco Nederland, replacement rail track in building CRDB – 2023/2024
Delivery of 672 meter of A75 rail and adjustable rail clips. We have replaced the block rail profile for an A75 crane rail in short down times of the Urenco factory.
SIF Maasvlakte Rotterdam – Expansion production plant – 2024
Delivery and installation of approx. 4.000 meters of rail- and crane tracks including soleplates, special rail clips and grouting materials (cement based and epoxy).
John F. Kennedy Airport New York, USA – Rail installation for ETV – 2024
Delivery and installation of 240 meters of crane rail type A65 installed on soleplates with fixed rail clips. The rail construction is grouted with cement-based grout.
Damen Shiprepair Vlissingen – renovation of quay crane track – 2024
Delivery of 150 pieces of new continuous soleplates, 3.000 pieces of the SF20 fixed rail clips, anchor bolts and grouting material. The renovation work was carried out in three phases during client’s operation
Dura Vermeer, Uithoornlijn, approx.. 400 thermite and puddle arc welding joints - 2023
Executing 400 thermite and puddle arc welding joints during the construction of the “Uithoornlijn” (tram track)
Concrete plant - Terneuzen - 2023
Delivery and replacement of 210 meters of rail track type NP46.
Nissan Motor Part Center Amsterdam, replacement of A65 rail tracks for stacker cranes – 2023
Delivery and replacement of 4 aisles x 120 meter per aisle with A65 rail. We have executed the work in a tight working schedule to reduce the down time of the stacker cranes.
Amstelpark Amsterdam, replacement of 600 wooden sleepers for concrete sleepers – 2023
Delivery of 600 concrete sleepers for the replacement of old wooden oak sleepers. We have replaced the 600 old wooden sleepers for new concrete sleepers.
SATS Air Cargo Building Singapore, Bridge Verhicle rail replacement – 2022
Delivery and replacement of 520 meters of block rail type 70×40 mm. Our team has replaced 520 meters of block rail on a height of approx.. 15 meters in different phases and according satisfaction of the client. We have removed the old rail by gouging.
Temporary crane track, Singelgracht Amsterdam - 2022
Delivery and installation of 455 meters temporary rail track including rail clips and fish plates for a portal crane in the city center of Amsterdam. A portal crane will run on our rail track to support the construction of a new parking garage under the Singel canal
SATS Air Cargo building Singapore, Coolport rail replacement - 2022
Delivery and replacement of 100 meters of A65 rail track in the Coolport. Our team replaced 100 meters of crane rail here in a cold storage room with a temperature of 5 degrees. For this project we have used our electric excavator to remove the old rail system and to execute the hacking work.
Maskargo Malaysia Airport – 2022
Delivery and replacement of 300 meters of A65 rail track for a Transver Verhicle. In a short shut down our team has replaced 300 meters of A65 crane rail. Our work was including cutting concrete, removal of concrete trench filling material and the removal of the old rail system. For this project we used our electric excavator to support our team with hacking work.
CONO KAAS MIDDENBEEMSTER – 2021

With use of our own developed trolley we measured a difficult-to-approach crane track. This track is situated above a brine bath.

DOVER US AIR FORCE BASE – 2021

SAMAX Rail has replaced a 360 meter long crane track type A100 in a storage building. The rails has been installed on continuous sole plates with use of adjustable rail clips. Rails have been welded together according the enclosed welding procedure.

TESLA GIGA FACTORY AUSTIN USA – 2021

Our installation team has installed a 60 meter crane track type S30 at the new TESLA factory in Austin USA. The track is discontinuously supported and installed with adjustable rail clips.

CLIP Intermodal Terminal Poland – 2020/2021

Supply and assembly 755 meters of crane track MRS87a. Crane track is mounted with an adjustable clamp plate on a milled concrete foundation. Our work was carried out to the full satisfaction of the client.

Project De Entree Amsterdam (light rail) – 2020 / 2021

On this project in the heart of Amsterdam, in front of Central Station, our rail welders made a total of approximately 750 RI60 and Dillidur (specials) formwork welds on behalf of Van Gelder.

Swissport Frankfurt Airport – 2020

Delivery and assembly of 212 meters of crane rail A65, discontinuous and with fixed clamping plates. The crane rail was assembled by us according to FEM9831 and welded by means of formwork welding. The work was carried out according to planning and to the full satisfaction of our client!

Smit Heat treatment, Waalhaven Rotterdam – 2020

For our client Smit-HT, SAMAX Rail has delivered a crane track on Stelcon plates. We have relieved our client by carrying out the complete package, ground improvement, delivery and installation of 60 industrial Stelcon plates on which the UIC54 rail was then mounted. The paving around the Stelcon plates was neatly closed by us.

Arcelor Mittal Ghent, All Weather Terminal – 2019/2020

Supply and assembly of 3 x 200 meters A100 and 16 x 23 meters A65 crane rail construction on a continuous base plate. The welding was carried out according to the formwork welding process. All crane tracks were mounted with a non-adjustable clamping plate. We also supplied a total of 38 end buffers for the quay crane, half-gantry and the transfer cars.

Van Leeuwen Pipes, Zwijndrecht – 2020

Replacement of 80 meters of A55 crane rail for an overhead crane. In a standstill of 2 days we replaced the A55 crane rail of a storage hall. After changing the rail, the crane rail was aligned and welded, all this in a very short lead time!

Tata Steel Tubes – Zwijndrecht – 2019

During a 2.5 week standstill, our experienced team of people replaced 2×200 meters of block rail with new A65 crane rail. We removed the old rail by gouging. After the old rail was removed, we provided the crane track beam with a hole pattern so that we could mount the A65 crane rail with adjustable clamping plates.

Block Berge Bygg – Klepp Stasjon Norway – 2019

Supply and assembly of 2×140 meter A65 crane rail construction on a continuous base plate. The welding was carried out according to the formwork welding procedure. The crane rail was mounted with a non-adjustable SAMAX clamp plate.

IJB Beton – Lelystad – 2019

Supply and assembly of 2×108 meter A65 crane rail construction on a steel construction. The crane rail is mounted with non-adjustable SAMAX clamping plates.

ECT Delta Terminal – Maasvlakte Rotterdam – 2019

Maintenance and repair of various trolley rail tracks on STS, rail and stack cranes

Navistar, Monterrey, Mexico – 2019

Supply, formwork welding and assembly of 90 meters of discontinuous rail construction MRS87a for a stacker crane. We mounted the crane rail with a non-adjustable SAMAX clamp plate. The rail construction is poured with low-shrinkage cement-based casting mortar.

IJB Concrete – Lemmer – 2019

Dismantling 500 metres of old crane track and supplying and assembling a new crane rail construction A65 on a continuous base plate. We also installed a total of 4 crane track level crossings for freight traffic. The crane rail was mounted with a non-adjustable SAMAX clamp plate. This work was carried out to full satisfaction during the 3-week construction stoppage.

Bosch Concrete – 2019

Supply, formwork welding and assembly of 624 meters of rail construction A75 and S49

Porsche, Zuffenhausen Germany – 2019

Welding and installation of an MRS87a rail construction for a stacker crane for the high-bay warehouse

South Carolina Port Authority – 2018/2019

Using our work platform, the SAMAX Rail welding team replaced short rail end pieces on 5 ZPMC STS cranes. All clamping plates and underlay material were also replaced by SAMAX Rail during this project.

SIF Group Maasvlakte – 2019

Realignment of 500 meters of crane track A120 at approx. 20 meters height. SAMAX also replaced all damaged rubber nose clamp plates and repaired the rail welds that were in poor condition.

Aston Martin, Wales, UK – 2018

Supply, welding and assembly of an S41 rail construction for a stacker crane for the paint line

SIF Group, Roermond – 2018

Replacement of 288 meters of A75 rail construction including the installation of new adjustable clamping plates.

Our Activities

SAMAX Rail provides expert railway consulting and engineering solutions, ensuring development of efficient, safe, and innovative rail infrastructure Please check our activities.

Contact us

Contact a specialist

Ronald Meihuizen

Projects & Sales

Niels van Rijn

Projects & Sales